Sustainability & ethics
Made responsibly, told honestly
We would rather give you checkable facts than green adjectives. Here is how our garments are made, who makes them, and what we do and don’t yet hold.
How a garment is made matters as much as the garment. We are a young factory building responsibly — and we would rather tell you plainly what is true today than claim badges we have not earned.
- Electricity
- 44,044 kWh on our last 12 electricity bills (September 2025 – August 2026): about 3,670 kWh a month — about 0.12–0.14 kWh per garment at full capacity (40,000–50,000 pieces a month) — from Nepal’s predominantly hydro-electric grid. Grid power only: we run no diesel generator. US ITA (source: Nepal Country Commercial Guide – Hydropower, water resources and renewable energy, opens in a new tab)
- Wages
- Every member of the team is paid above Nepal’s statutory minimum wage, on time, every cycle.
- Cutting waste
- Cutting-room offcuts are collected every day and go to a local textile recycler.
- Water
- No process water — we cut and sew. Dyeing happens upstream at fabric mills, where OEKO-TEX-certified fabric is available on request.
- People
- 80–90% women month to month (we publish 80% as the floor), all local and permanent — including two deaf operators running the same machines to the same standard.
We don’t yet hold third-party social certifications such as amfori BSCI or Sedex/SMETA — we say so plainly, and they are on our roadmap. Your audit is welcome any time.
Energy
The power behind your garments
Nepal makes most of its electricity from its rivers. Here is what that means for your order, in numbers you can check.
-
89%
of the electricity available in Nepal in 2024/25 was generated in Nepal — overwhelmingly from hydropower (NEA 34%, independent producers 55%). US ITA (source: Nepal Country Commercial Guide – Hydropower, water resources and renewable energy, opens in a new tab) New Spotlight Magazine (source: NEA at 40, FY 2081/82 (2024/25): 15,641 GWh available (NEA 34%, independent producers 55%); 2,380 GWh exported to India, 1,712 GWh imported; exports to Bangladesh began, opens in a new tab)
-
≈11%
was imported from India (1,712 GWh), mostly in the dry season, December to March, when the rivers run low. We tell you, because a buyer will ask. New Spotlight Magazine (source: NEA at 40, FY 2081/82 (2024/25): 15,641 GWh available (NEA 34%, independent producers 55%); 2,380 GWh exported to India, 1,712 GWh imported; exports to Bangladesh began, opens in a new tab)
-
2,380 GWh
exported to India the same year, and Nepal began selling power to Bangladesh: in the monsoon, Nepal’s rivers power its neighbours too. New Spotlight Magazine (source: NEA at 40, FY 2081/82 (2024/25): 15,641 GWh available (NEA 34%, independent producers 55%); 2,380 GWh exported to India, 1,712 GWh imported; exports to Bangladesh began, opens in a new tab)
-
0
diesel generators at our factory. Grid power only: 44,044 kWh over our last 12 bills, about 0.12–0.14 kWh per garment at full capacity.
- 3,6773.7 Sept
- 3,1403.1 Oct
- 3,2763.3 Nov
- 2,5932.6 Dec
- 3,4263.4 Jan
- 3,6473.6 Feb
- 2,5582.6 Mar
- 3,7523.8 Apr
- 3,4133.4 May
- 4,3114.3 Jun
- 4,8174.8 Jul
- 5,4345.4 Aug
kWh on each monthly bill from the Nepal Electricity Authority, September 2025 – August 2026. Use rises in the hot months, June to August.
Need figures for your Scope 3 or supplier report? Ask for our energy data — monthly kWh and the grid mix — and we’ll send what we have.
Ask for our energy dataWhy we don’t call ourselves “green”, “eco-friendly” or “carbon-neutral”: those words say nothing you can check, and from 27 September 2026 the EU bans such claims without proof. We give you the numbers instead.
01Factory facts 2026
Numbers, not adjectives
Owner-stated, checkable on a visit or a video call. Updated when the facts change.
02
What we don’t claim
We don’t yet hold BSCI, SMETA or GOTS, and we won’t show a badge we haven’t earned. If certification is a requirement for your programme, tell us and we’ll say honestly whether we can meet your timeline — or see our full compliance status.
Sources & last verified
Page facts checked
We link every trade claim to the body that publishes it — official sources first. Rules change; if you spot something out of date, tell us.
- 01 Nepal Country Commercial Guide – Hydropower, water resources and renewable energy U.S. International Trade Administration (trade.gov) · official · checked 24 Sept 2026
- 02 NEA at 40, FY 2081/82 (2024/25): 15,641 GWh available (NEA 34%, independent producers 55%); 2,380 GWh exported to India, 1,712 GWh imported; exports to Bangladesh began New Spotlight Magazine (Nepal Electricity Authority figures) · checked 25 Sept 2026
Namaste — let’s talk
Tell us what you want to make.
Send a tech pack, a photo or just an idea. You’ll hear back from the people who run the floor — usually within 24 hours, Nepal time.
No WhatsApp and rather not email? Request a call-back and we’ll phone you.