Styles · colours · minimums · timeline
MOQ & colour planner
List your styles and colours. See which ones meet a 1,000-piece-per-colour minimum, how to fix the ones that don’t, and roughly how long the range takes to make.
4,200 pieces in 5 style-colour runs; 1 style below the minimum.
Your range
4,200 pieces
5 style-colour runs · minimum at 1,000 per colour: 5,000
- Crew-neck tee: 3 × 1,000 = 3,000
- Pique polo: 2 × 600 = 1,200Below our 1,000-per-colour minimum (flexible per programme, so ask if you’re close). With the same 1,200 pieces you could run 1 colour at the minimum, or raise each colour to 1,000 (2,000 in total).
Share of a month’s output: 14–16.2% of 26,000–30,000 pieces
Typical timeline: samples in 7–14 days after tech-pack review, then bulk in 40–50 days after sample approval.
Based on Trishakti Apparel’s minimum and capacity. Other factories’ figures differ: ask each one in writing.
Questions
Minimums, explained.
Why is the minimum per colour, not per order?
How do I keep a first order small?
How long does production take?
Do other factories work the same way?
Namaste — let’s talk
Want us to plan your range?
Send your styles, colours and sizes. We’ll confirm minimums, a production slot and an FOB quote, usually within 24 hours (Nepal time).
No WhatsApp and rather not email? Request a call-back and we’ll phone you.